Refit Crew
It takes a lot of good people to operate, maintain, and rebuild a fine vessel like Dorothea. Here is a listing of some of the 2006 refit crew. . .
Captain: John Crupi
First Mate/Administrator: Jenifer Mosley
Engineer: Revel Boulon
Project Manager: Malcolm Munsey, Surveyor
Design Architect: Tom Henderson, GTH Design Techniques Inc.
Naval Architect: Rick Etsell, Pacific Motor Boat Design
Interior Decorator: Lorraine Letendre
Lake Union Boat Repair
Bakketun & Thomas Boat Co.
Lake Union Dry Dock (fuel tanks and stem repair)
Pacific Fishermen Shipyard (hull and bottom work)
J3 Systems (hydraulics)
Honor Marine - Marine communications
AquaAir Air Conditioning
Naiad stabilizers
Noverania Tenders
Hydro Pro (Crane)
Superior Marine Electric ( main switch board & alarm panels)
Marine Sanitation (sanitary systems)
Head Hunter Inc (toilets)
Hamilton Hough Marine (steering and engine silencers
Northwest Marble & Terrazzo Co.
Vegia plumbing systems
Village Marine Tec (watermakers)
Pacific Coast Marine (doors & hatches)
N.C. Machinery (engine overhauls)
Seaworthy Services (painting)
Website
Site design & webmaster, Rick Etsell
Photos & content: Capt. John Crupi (except where noted.)
Home | Particulars | Cruising History | Ship's Crew | Refit Crew | Links | Photo Gallery | Contact